Before The Mill Arrives
You Can Help By:
Cutting the logs to the desired length 6'-20'
Have the logs in one central location which should be level and large enough to accommodate the mill, tractor (if needed) and milled material
Position the logs parallel to each other and center them lengthwise
Place the logs on skids to ease rolling them onto the hydraulic loader of the mill
Remove all dirt, stones, dirty bark and any other debris from the logs
Provide one or more workers to assist the sawyer at all times during the cutting. Worker must be able to do moderate physical labor
From Logs to Boards